Author Averbakh, I.; Pereira, J doi  openurl
  Title Tree optimization based heuristics and metaheuristics in network construction problems Type
  Year 2021 Publication Computers & Operations Research Abbreviated Journal (up) Comput. Oper. Res.  
  Volume 128 Issue Pages 105190  
  Keywords Network design; Scheduling; Network construction; Heuristics; Metaheuristics; Local search  
  Abstract We consider a recently introduced class of network construction problems where edges of a transportation network need to be constructed by a server (construction crew). The server has a constant construction speed which is much lower than its travel speed, so relocation times are negligible with respect to construction times. It is required to find a construction schedule that minimizes a non-decreasing function of the times when various connections of interest become operational. Most problems of this class are strongly NP-hard on general networks, but are often tree-efficient, that is, polynomially solvable on trees. We develop a generic local search heuristic approach and two metaheuristics (Iterated Local Search and Tabu Search) for solving tree-efficient network construction problems on general networks, and explore them computationally. Results of computational experiments indicate that the methods have excellent performance.  
  Address  
  Corporate Author Thesis  
  Publisher Place of Publication Editor  
  Language Summary Language Original Title  
  Series Editor Series Title Abbreviated Series Title  
  Series Volume Series Issue Edition  
  ISSN 0305-0548 ISBN Medium  
  Area Expedition Conference  
  Notes WOS:000632975100009 Approved  
  Call Number UAI @ alexi.delcanto @ Serial 1362  
Permanent link to this record
 

 
Author Averbakh, I.; Pereira, J. pdf  doi
openurl 
  Title Lateness Minimization in Pairwise Connectivity Restoration Problems Type
  Year 2018 Publication Informs Journal On Computing Abbreviated Journal (up) INFORMS J. Comput.  
  Volume 30 Issue 3 Pages 522-538  
  Keywords combinatorial optimization; networks: scheduling; programming: branch and bound; network restoration; network construction; integrated network design and scheduling  
  Abstract A network is given whose edges need to be constructed (or restored after a disaster). The lengths of edges represent the required construction/restoration times given available resources, and one unit of length of the network can be constructed per unit of time. All points of the network are accessible for construction at any time. For each pair of vertices, a due date is given. It is required to find a construction schedule that minimizes the maximum lateness of all pairs of vertices, where the lateness of a pair is the difference between the time when the pair becomes connected by an already constructed path and the pair's due date. We introduce the problem and analyze its structural properties, present a mixed-integer linear programming formulation, develop a number of lower bounds that are integrated in a branch-and-bound algorithm, and discuss results of computational experiments both for instances based on randomly generated networks and for instances based on 2010 Chilean earthquake data.  
  Address [Averbakh, Igor] Univ Toronto Scarborough, Dept Management, Toronto, ON M1C 1A4, Canada, Email: averbakh@utsc.uturonto.ca;  
  Corporate Author Thesis  
  Publisher Informs Place of Publication Editor  
  Language English Summary Language Original Title  
  Series Editor Series Title Abbreviated Series Title  
  Series Volume Series Issue Edition  
  ISSN 1091-9856 ISBN Medium  
  Area Expedition Conference  
  Notes WOS:000449096000008 Approved  
  Call Number UAI @ eduardo.moreno @ Serial 924  