| 
Citations
 | 
   web
Canessa, G., Gallego, J. A., Ntaimo, L., & Pagnoncelli, B. K. (2019). An algorithm for binary linear chance-constrained problems using IIS. Comput. Optim. Appl., 72(3), 589–608.
toggle visibility
Canessa, G., Moreno, E., & Pagnoncelli, B. K. (2021). The risk-averse ultimate pit problem. Optim. Eng., 22, 2655–2678.
toggle visibility
Letelier, O. R., Clautiaux, F., & Sadykov, R. (2022). Bin Packing Problem with Time Lags. INFORMS J. Comput., Early Access.
toggle visibility
Letelier, O. R., Espinoza, D., Goycoolea, M., Moreno, E., & Munoz, G. (2020). Production Scheduling for Strategic Open Pit Mine Planning: A Mixed-Integer Programming Approach. Oper. Res., 68(5), 1425–1444.
toggle visibility
Moreno, E., Rezakhah, M., Newman, A., & Ferreira, F. (2017). Linear models for stockpiling in open-pit mine production scheduling problems. Eur. J. Oper. Res., 260(1), 212–221.
toggle visibility
Moreno, S., Pereira, J., & Yushimito, W. (2020). A hybrid K-means and integer programming method for commercial territory design: a case study in meat distribution. Ann. Oper. Res., 286(1-2), 87–117.
toggle visibility
Ogunmodede, O., Lamas, P., Brickey, A., Bogin, G., & Newman, A. (2022). Underground production scheduling with ventilation and refrigeration considerations. Optim. Eng., 23(3), 1677–1705.
toggle visibility
Rezakhah, M., Moreno, E., & Newman, A. (2020). Practical performance of an open pit mine scheduling model considering blending and stockpiling. Comput. Oper. Res., 115, 12 pp.
toggle visibility
Torres, N., Greivel, G., Betz, J., Moreno, E., Newman, A., & Thomas, B. (2024). Optimizing steel coil production schedules under continuous casting and hot rolling. Eur. J. Oper. Res., 314(2), 496–508.
toggle visibility