List View
 |   | 
   web
Author Title Year Publication (up) Volume Pages
Espinoza, D.; Goycoolea, M.; Moreno, E.; Newman, A. MineLib: a library of open pit mining problems 2013 Annals Of Operations Research 206 93-114
Barrera, J.; Moreno, E.; Varas, S. A decomposition algorithm for computing income taxes with pass-through entities and its application to the Chilean case 2020 Annals Of Operations Research 286 545-557
Espinoza, D.; Moreno, E. A primal-dual aggregation algorithm for minimizing conditional value-at-risk in linear programs 2014 Computational Optimization And Applications 59 617-638
Munoz, G.; Espinoza, D.; Goycoolea, M.; Moreno, E.; Queyranne, M.; Rivera Letelier, O. A study of the Bienstock-Zuckerberg algorithm: applications in mining and resource constrained project scheduling 2018 Computational Optimization And Applications 69 501-534
Moreno, E.; Beghelli, A.; Cugini, F. Traffic engineering in segment routing networks 2017 Computer Networks 114 23-31
Rezakhah, M.; Moreno, E.; Newman, A. Practical performance of an open pit mine scheduling model considering blending and stockpiling 2020 Computers & Operations Research 115 12 pp
Acuna, V.; Ferreira, C.E.; Freire, A.S.; Moreno, E. Solving the maximum edge biclique packing problem on unbalanced bipartite graphs 2014 Discrete Applied Mathematics 164 2-12
Espinoza, D.; Goycoolea, M.; Moreno, E. The precedence constrained knapsack problem: Separating maximally violated inequalities 2015 Discrete Applied Mathematics 194 65-80
Matamala, M.; Moreno, E. Minimum Eulerian circuits and minimum de Bruijn sequences 2009 Discrete Mathematics 306 5298-5304
Barrera, J.; Beaupuits, P.; Moreno, E.; Moreno, R.; Munoz, F.D. Planning resilient networks against natural hazards: Understanding the importance of correlated failures and the value of flexible transmission assets 2021 Electric Power System Research 197
Coudert, D.; Luedtke, J.; Moreno, E.; Priftis, K. Computing and maximizing the exact reliability of wireless backhaul networks. 2018 Electronic Notes in Discrete Mathematics 64 85-94
Lagos, G.; Espinoza, D.; Moreno, E.; Vielma, J.P. Restricted risk measures and robust optimization 2015 European Journal Of Operational Research 241 771-782
Freire, A.S.; Moreno, E.; Yushimito, W.F. A branch-and-bound algorithm for the maximum capture problem with random utilities 2016 European Journal Of Operational Research 252 204-212
Moreno, E.; Rezakhah, M.; Newman, A.; Ferreira, F. Linear models for stockpiling in open-pit mine production scheduling problems 2017 European Journal Of Operational Research 260 212-221
Ljubic, I.; Moreno, E. Outer approximation and submodular cuts for maximum capture facility location problems with random utilities 2018 European Journal Of Operational Research 266 46-56
Matus, O.; Barrera, J.; Moreno, E.; Rubino, G. On the Marshall-Olkin Copula Model for Network Reliability Under Dependent Failures 2019 IEEE Transactions On Reliability 68 451-461
Barrera, J.; Homem-De-Mello, T.; Moreno, E.; Pagnoncelli, B.K.; Canessa, G. Chance-constrained problems and rare events: an importance sampling approach 2016 Mathematical Programming 157 153-189
Ramirez-Pico, C.; Moreno, E. Generalized Adaptive Partition-based Method for Two-Stage Stochastic Linear Programs with Fixed Recourse 2021 Mathematical Programming to appear
Tarifeno-Gajardo, M.; Beghelli, A.; Moreno, E. Availability-Driven Optimal Design of Shared Path Protection in WDM Networks 2016 Networks 68 224-237
Chicoisne, R.; Espinoza, D.; Goycoolea, M.; Moreno, E.; Rubio, E. A New Algorithm for the Open-Pit Mine Production Scheduling Problem 2012 Operations Research 60 517-528